Reconstruction of the Cyclone Damaged Road at Laxmipur

The Alamin Construction Company constructed the 262.00m long and 10m wide Pre-Stressed Concrete Girder Bridge (1st Dholeshwari Bridge) on cast-in-situ bored pile foundation at 17th km of Dhaka Khulna Road under Munshigonj Road Division.

Client: Roads and Highways Department, Ministry of Communication. Government of Bangladesh.

Project Cost: 5.94 Million USD

Reconstruction of the Cyclone Damaged Road

Reconstruction of the Cyclone Damaged Road

Salient Features:

  1. Pre Stressed Concrete Girder & RCC Bridge.
  2. Approach road.
  3. 3)Earth Work, flexible pavement, asphalt concrete work
  4. Piling Work
  • Land based pile (760mm dia 32m long cast in situ bored pile)
  • Water based pile by berge mounted rig (1000mm dia 35m long cast in situ bored pile)
  • Total nos of pile 111 Nos.
  1. Temporary jetty for pre-stressing work
  2. Length of bridge 262m
  3. Width 10m (2 lane)
  4. 6 spans
  5. 30 PC Girders
  6. 5 Piers.
  7. Abutment 2 nos. and counter-fort type.