The Shewla Bridge Construction

The Shewla Bridge is located at  38th Km. of Sylhet- Sutarkandi Road.

Project Name: Shewla Bridge at 38th Km. of Sylhet-Sutarkandi Road.

During the year : 1993-1994.

Client: Roads and Highways Department, Ministry of Communication. Government of Bangladesh.

 

A PC Girder and Steel Truss Bridge

A PC Girder and Steel Truss Bridge

 

Salient Features:

  • Piling work

i)  Land based piling (1000 mm dia 30m long cast-in-situ pile)

ii)  Water based piling by barge mounted rig (1000 mm dia 30 m long cast-in-situ pile)

iii)  Total Nos. of Pile – 76